دسته بندی نشده

Utility  Of  Gas Compression and RU Plant

Technical, Financial Feasibility Study and Implementing Industrial

Utility  Of  Gas Compression and RU Plant

Project Details  of Gas Compression and RU Plant

Date: 2015 – 2017
Owner: National Petrochemical Company
Location: West Area- Iran
Contractor: Siemens
Description: Basic and detail design, Piping design, Fix and Rotary equipment design. Performances: Design, Procurment
Career: Project Detail Engineering/Mechanical, Instrument, Civil Engineering Duration: 2 years

Gas Compression Plant

For more information about the specifications   Utility  of  Power Plant   project  you can contact Karduk

Technical, Financial Feasibility Study and Implementing Industrial Utility and RU Plant

Date: 2020 – 2021
Owner: BPC & PPB
Location: Sanandaj – Iran
Contractor: NPCRT
Description: Basic and detail design, Piping design, Fix and Rotary equipment design, Industrial refrigeration, HVAC
Performances: Design, Procurement, Construction Supervision, Commissioning and Strat Up
Career: Project Detail Engineering/Mechanical, Instrument, Civil Engineering Duration: 2 years

Utility  Of RU Plant

For more information about the Utility  Of  Gas Compression and RU Plant  you can contact Karduk  via WhatsApp, Telegram or E-mail.

Phone+982166418908
Emailkarduuk@gmail.com

 

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
دریافت مشاوره