Utility of Power Plant
Technical, Financial Feasibility Study and
Implementing Industrial Utility of Power Plant
Project Details of Gas / Steam Turbine Power Plant :
Date: 2020 – 2021
Owner: BPC
Location: Sanandaj – Iran
Contractor: STP, ENERPROJECT (Gas Compression & Industrial Refrigeration)
Description: Basic and detail design, Piping design, Fix and Rotary equipment design
Performances: Design Review, Procurement, Construction Supervision, Commissioning and Strat Up
Career: Project Detail Engineering/Mechanical, Instrument, Civil Engineering
Duration: 2 years
For more information about the specifications Utility of Power Plant project you can contact Karduk.
Technical, Financial Feasibility Study and Implementing Industrial Utility of Separation and Reforming Plant
Project Details of Separation and Reforming Plant :
Date: 2021 – 2022
Owner: PSF
Location: Mahshahr – Iran
Contractor: PSF
Description: Basic and detail design, Piping design, Fix and Rotary equipment design. Performances: Design, Procurement
Career: Project Detail Engineering/Mechanical, Instrument, Civil Engineering
Duration: 2 years
For more information about the Utility of Power Plant and specifications of Industrial Utility of separation and Reforming Plant you can contact Karduk via WhatsApp, Telegram or E-mail.