دسته بندی نشده

Utility of Power Plant

Technical, Financial Feasibility Study and

Implementing Industrial Utility of Power Plant

Project Details of Gas / Steam Turbine Power Plant :

Date:  2020 – 2021

Owner:  BPC

Location:    Sanandaj – Iran

Contractor:   STP, ENERPROJECT (Gas Compression & Industrial Refrigeration)

Description:   Basic and detail design, Piping design, Fix and Rotary equipment design

Performances: Design Review, Procurement, Construction Supervision, Commissioning and Strat Up

Career:   Project Detail Engineering/Mechanical, Instrument, Civil Engineering

Duration:  2 years                                 

Utility of Power Plant

For more information about the specifications   Utility  of  Power Plant   project  you can contact Karduk.

Technical, Financial Feasibility Study and  Implementing Industrial Utility  of  Separation and Reforming Plant

Project Details of Separation and Reforming Plant :

Date:  2021 – 2022

Owner:   PSF

Location: Mahshahr – Iran

Contractor:   PSF

Description:     Basic and detail design, Piping design, Fix and Rotary equipment design. Performances:  Design, Procurement

Career:  Project Detail Engineering/Mechanical, Instrument, Civil Engineering

Duration:   2 years

Utility of Separation and Reforming Plant

For more information about the Utility  of  Power Plant and  specifications  of Industrial  Utility of separation and Reforming Plant  you can contact Karduk  via WhatsApp, Telegram or E-mail.

Phone+982166418908
Emailkarduuk@gmail.com

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
دریافت مشاوره