Projects: Implementation of industrial water purification systems
project Details:
Date: 2021 – 2022
Owner: PACT Engineering, SAIF Zone, UAE
Location: Basrah WTP (Iraq)
Description: Basic and detail design, Piping design (3D modeling and mechanical calculations), Fix and Rotary equipment design.
Performances: Design & Engineering, Procurement, Construction Supervision.
Career: Project Detail Engineering/Mechanical, Instrument, Civil Engineering
Duration: 2 years
Project Details:
Date: 2021 – 2022
Owner: Di-polymer Aryan (Aryan Methanol), WTP
Location: South Pars Oil Field, Special Zone
Description: Piping design (3D modeling and mechanical calculations), Fix and Rotary equipment design.
Performances: Design & Engineering, Procurement, Construction Supervision.
Career: Project Detail Engineering/Mechanical, Instrument, Civil Engineering
Duration: 2 years
For more information about the specifications of projects you can contact Karduk via WhatsApp, Telegram or E-mail.
Phone: +982166418908
Email: karduuk@gmail.com